We invite you to track current vessel traffic at the Port of Gdańsk:

Basen Górniczy Terminal

At the Mining Basin quays, handling operations of bulk dry goods, bulk liquid goods, scrap, machinery, structures, steel products, and unitized general cargo are carried out.

  • Ship length:
    do 225 m
    Maximum draft:
    10,6 m
  • Operational length of quays:
    - Coal - 780 m
    - Ore - 695 m
    - Administrative - 125 m
  • Storage yards and open stockpiles
    – ok. 430.000 m2 with a maximum permissible load capacity ranging from 2 to 10 t/m.2
    – ok. 3.500 m2 with a maximum permissible load capacity of up to 2 t/m.2

Szczecińskie Quay

Szczecin Quay is adapted for handling container, machinery, structures, steel products, and unitized general cargo operations.

  • Ship length:
    do 225 m
    Maximum draft:
    10,6 m
  • Operational length of the quay:
    365 m
  • Warehouses:
    – ok. 4 800 m2
  • Storage yards:
    – ok. 24.500 m2 with a maximum permissible load capacity of up to 10 t/m.2
    – ok. 24.000 m2 with a maximum permissible load capacity of up to 4.5 t/m.2

Wiślane Quay

This quay is prepared to handle goods such as machinery, structures, steel products, unitized general cargo, dry bulk cargoes, and other bulk cargoes.

  • Ship length:
    do 225 m
    Maximum draft:
    10,20 m
  • Operational length of the quay:
    1 160 m
  • Covered general cargo warehouses
    – ok. 11.700 m2 The maximum permissible load here ranges from 3 to 5 tonnes per meter.2
  • Storage yards:
    – ok. 41.500 m2 The maximum permissible load here is up to 6 tonnes per meter.2